Hickory Hornet Stadium Turf Installation |
|
|
|
|
HERMITAGE SCHOOL DISTRICT |
|
411 NORTH HERMITAGE ROAD
HERMITAGE, PA 16148-3316 |
|
|
|
DR. DANIEL J. BELL, SUPERINTENDENT
724-981-8750 |
|
|
|
BID: APRIL 14, 2010
COMPLETED: AUGUST 2010
|
|
|
|
COST: $ 749,908
(6 CHANGE ORDERS FOR A
NET DEDUCT OF $49,857)
|
|
|
|
|
|
|
|
|
|
|
Client since 1960
|
|
|
|
MORE INFO: |
Project scope included the design and construction administration of a new artificial turf field installation for football and soccer.
- The new turf replaced the existing natural grass field built over an obsolete drainage system.
- The existing high jump area remained. A new pole vault runway and landing pad was added.
- The design work included supplemental drainage system over the existing in-place system, and other storm water management improvements.
|
|