|
|
|
|
|
Ringgold Middle School (5-8) |
|
|
|
|
RINGGOLD SCHOOL DISTRICT |
|
400 MAIN STREET
NEW EAGLE, PA 15067-1108 |
|
|
|
|
|
|
|
BID: 1ST QUARTER 2016
COMPLETED: AUGUST 2017 |
|
|
|
|
|
|
|
NEW BUILDING OF 100,353 S.F.
STATE REIMBURSEMENT: 11.33% |
|
|
|
|
|
|
|
Client since 2008 |
|
|
|
|
MORE INFO: |
Click on the link below to see drone footage of the gym renovations.
Ringgold Drone Footage
The new 2-story School for grades 5-8 will be constructed on the current Ringgold High School site.
Features:
- Expanded existing site accommodates parking at the front and rear of the High School. New drives provide access to the School at two locations;
- Each grade level neighbor-hood has classrooms and special education rooms;
- Core areas are located close to the main entrance with easy access to each grade level grouping and include gymnasium, cafeteria, auditorium, stage, offices, and library;
- STEM Lab and Assembly areas;
- Sustainable design tech-niques to minimize energy demand. HVAC system is a 4 pipe using central station air handling units and variable air volume ap-proach.
|
|
|
PROFILES AND OTHER PDFS: |
|
|
|