HHSDROur PortfolioOur ServicesFirm NewsAwardsTestimonialsDirectionsAbout UsContact Us
   
 
 Ringgold HS Kitchen/Cafeteria Renovations
 

 
RINGGOLD SCHOOL DISTRICT
 
400 MAIN STREET
NEW EAGLE, PA 15067-1108
   
 
DR. KAREN POLKABLA, SUPERINTENDENT 724-258-9329
   
 
BID: JUNE 11, 2008
COMPLETED: JANUARY 30, 2009
   
 
COST: $ 4,500,000
   
 
6,000 SQ. FT. ADDITION
   
 
STATE REIMBURSEMENT: N/A
   
 
Client since 2008
 
 
      
 
MORE INFO:
Structural wall and floor problems created from pyritic soils required remediation and reconstruction in and around the cafeteria, kitchen and band corridor.

The scope of work included the following:

  • Controlled demolition of areas of the kitchen, cafeteria and hallway, including asbestos abatement.
  • Over-excavation and installation of a seal slab over a crawl space using mini-pile foundations.
  • Removal of the pyritic soils.
  • Update the finishes and environmental systems in the kitchen, cafeteria and hallway.
  • Install new food service equipment.
 
PROFILES AND OTHER PDFS:
 

Home
| Portfolio | Services | Firm News | Awards | Testimonials | Directions | About Us | Contact

 
HHSDR, Inc. Copyright © 2013 All rights reserved.