HHSDROur PortfolioOur ServicesFirm NewsAwardsTestimonialsDirectionsAbout UsContact Us
   
 
 Baldwin High School
 

 
BALDWIN-WHITEHALL SCHOOL DISTRICT
 
4653 CLAIRTON BOULEVARD
PITTSBURGH, PA 15236-1817
   
 
DR. LAWRENCE C. KORCHNAK SUPERINTENDENT
412-885-7810
   
 
BID: DECEMBER 1, 2005
COMPLETED: JUNE 2009
   
 
COST: $55,451,797
   
 
311,000 SQ. FT. ADDITION
84,667 SQ. FT. ALTERATION
395,667 SQ. FT. TOTAL
   
 
STATE REIMBURSEMENT: 22.45%
   
 
Client since 2005
 
 
      
      
 
MORE INFO:
Serving 2,000 students in grades 9 - 12. The new Baldwin High School houses:

• 108 instructional spaces
• 2 spectator gyms
• 6-lane pool
• Large-group instruction room
• Auditorium and stage
• TV studio

The building design reflects functions of the educational program, providing a free flow of movement, information and knowledge. A comfortable and easily supervised corridor network facilitates student movement and links the clustered departments. Flexibility, accessibility, safety , security and sustainability are provided in the building desig n. Construction took place in 5 major phases. Building materials are drawn from the Pittsburgh region.
 
PROFILES AND OTHER PDFS:
 

Home
| Portfolio | Services | Firm News | Awards | Testimonials | Directions | About Us | Contact

 
HHSDR, Inc. Copyright © 2013 All rights reserved.