The scope of work generally included the expansion of the number and size of workstations in two science laboratories.
This included the following elements:
- Enlarged peninsula work stations.
- Increased number of drawer storage space.
- Replacement of existing down-draft exhaust system with a snorkle-type exhaust system.
- New ADA-compliant work stations.
|